Product line
Groundwater Treatment Process
Made by Northrop Grumman Systems CORP
Its documents name it and state no specifications.
From Northrop Grumman Systems CORP’s own documents · read October 12, 2026 · not verified by FactoryRegistry
38 families in Groundwater Treatment Process
Backfill and RestorationLocation: Emma St intersectionCommunity Virtual MeetingDate: Sept 23DownlightingElectronic Speed SignageLocation: Stewart AveExcavation of trenchLength: 2220 ftFlag Personnel AssistanceActivity: flag assistanceGroundwater Monitoring WellsHydraulic pressure testing equipmentIn‑Situ Thermal Remedy (ISTR) equipmentNational Grid CoordinationPartner: National GridOff‑site groundwater remedial systemOU3 systemPiping – South Pershing SegmentLocation: South PershingPiping – Stewart Avenue SegmentLocation: Stewart AveRemedial equipmentRoad Cutting for TrenchActivity: road cuttingRoad signsRoad stripingRW-22 well electrical installationSod RestorationAddress: 37 Emma StSoil vapor treatment systemSpeed zone signStaging Area Vehicle AccessLocation: Broadway/Arthur AveSteel plate roadTraffic Control Signage InstallationLocation: Central AveTraffic controlsTraffic safety controlsTraffic safety signageTreatment Plant BuildingSize: 126ft x119ft x35ftTrench excavation Emma Street corridorLength: 1830ftVOCs treatment technologyWater pipe installationWater pipe replacementWater treatment facilityWell pump installationWell Vault WorkLocation: William St vaultWell‑drilling equipmentWellhead treatment system
2 models
Documents
Where this comes from — 2 documents
A machine read this from documents Northrop Grumman Systems CORP publishes on its own website, as of October 12, 2026. FactoryRegistry has not verified it; the documents are the authority.
- Form W-8 IMY (Rev. October 2021): “Groundwater Treatment Process”
- RW-21 Offsite Groundwater Project, page 17: “treats the water to NY State drinking water standards”
