Product line
Piping Installation
Made by Northrop Grumman Systems CORP
- Length
- 2100 ft
From Northrop Grumman Systems CORP’s own documents · read October 12, 2026 · not verified by FactoryRegistry
89 families in Piping Installation
24\" diameter underground pipeline segmentSize: 24"AsphaltAsphalt cutting equipmentAsphalt InstallationBackfill and temporary asphaltBackfilling and Paving RestorationCentral Avenue segmentCentral Avenue traffic control signage installationElectrical conduitsElectrical equipment installationElectrical workElectronic “your speed is” signageEmma Street (east) crew workEmma Street (west) crew workEmma Street piping installationLength: 1820ftEmma Street segmentExcavationLength: 860ftFusing EquipmentGroundwater PipingGroundwater Sampling RigGrumman Road East pipeline segmentHydrostatic pipeline testingMechanical equipment installation for RW‑21 wellNew piping sectionNorth Herman Avenue piping installationLength: 1820ftNorth Herman Avenue piping workNorth Herman Avenue segmentPavement saw cut restorationPaving restorationPipe installation segmentPipe repairPipe segment 250 ftLength: 250ftPipelinePipesPiping MaterialsPiping Materials StagingPneumatic pressure testing equipmentRoad closureDuration: 10 daysRoad Closure SignageRoad closures on Stewart AvenueRoad Work SignsRoutine groundwater sampling on N. Herman AvenueRW-21RW-21 ConduitRW-21 Electrical InstallationRW-21 equipment vehiclesRW-21 Mechanical Equipment InstallationRW-21 pipeline segmentRW-21 pipingRW-21 Piping installationRW-21 Piping MaterialsRW-21 Pneumatic Testing EquipmentRW-21 power supply wiringRW-21 well mechanical equipment installationRW-21 well vaultRW-21 well vault electrical equipmentRW-21 Well Vault Power SupplyRW-22 Electrical InstallationRW-22 Pneumatic Testing EquipmentRW-22 well vaultRW-22 well vault mechanical equipmentRW‑21 pipingRW‑21 Piping InstallationLength: 1820 ftRW‑21 well vault mechanical equipmentRW‑21 well vault piping workRW‑22 pipingS. Pershing, Brenner, and Sheridan piping workSaw cut pipeline routeStaging area equipment vehiclesStewart Avenue pipe fusing and backfillingStewart Avenue piping installationSupport truckT‑connectorTemporary construction barrierTemporary construction barrier across S. PershingTest pittingTraffic control signageTraffic control signsTrench excavation equipmentTrench Saw CuttingUtility locate test pittingUtility locate workUtility vault installationUtility vehiclesWell hatchWell Maintenance RigWell sampling locationWell vault electrical serviceWiring for RW-20 well vault power supply
1 model
| Model |
|---|
| Pipeline segment |
Documents
Where this comes from — 10 documents
A machine read this from documents Northrop Grumman Systems CORP publishes on its own website, as of October 12, 2026. FactoryRegistry has not verified it; the documents are the authority.
- 1 | P a g e, page 1: “pipe installation on Sheridan”
- 1 | P a g e, page 1: “installation of piping to support the RW-21 groundwater treatment system”
- 1 | P a g e, page 1: “installed approximately 2,100 feet of piping”
- 1 | P a g e, page 1: “installed approximately 2,100 feet of piping”
- 1 | P a g e, page 1: “RW-21 Piping installation”
- 1 | P a g e, page 1: “installation of piping to support the RW-21 groundwater treatment system”
- 1 | Page, page 1: “piping installation”
- 1 | Page, page 1: “installation of piping to support the RW‑21 groundwater treatment system”