FactoryRegistry
Claim a page

Product line

Power & Energy

Made by Oldcastle Infrastructure, INC. · Atlanta, GA

Its documents name it and state no specifications.

From Oldcastle Infrastructure, INC.’s own documents · read October 16, 2026 · not verified by FactoryRegistry

7 families in Power & Energy

63 models

ModelSizeMaterialTypePhase
1P TRANS PAD-KY4'-4" x 3-4" x 0'-4"concrete——
24 LPB24” DIA—Light Pole Base—
24R-LPB24” Dia. x 6’-6” x Variesprecast concrete——
28-ELECHH28” DIA—Electrical Hand Hole—
42 x 4242x42———
44x54x6 PAD44"x54"x6———
72x72x6 PAD72x72x6———
75 x 8875x88———
80x90x6 PAD80x90x6———
96 x 15696x156———
100 x 102100x102———
100x104x6 PAD100"x104"———
776-PCORP6'-4"x6'-4"x5'-1"ID———
1824-BL——base—
1824-LA1'-5"x1'-10"x1'-4"———
1824-S——cover—
6464————
AP 667-KY6-0"x6-0"x7-0",rating=airport,weight_top_slab=12200lbs,weight_base_section=18900lbs,total_weight=31100lbs,concrete_stren———
APS Padmounts————
GPU Energy (KVA 75-150) Model: GPUTP7787'x7'x8"———
Model: APS PADS————
Model: TEP PADS————
MS-7920———Single
MS-7933———Three
MS-7935———Three
MS-7937———Three
NEPTP-75-300KVA5’-0” x 7’-0” x 3’-0”concrete——
NUTP SPC P-0235’-10” x 6’-8” x 6”———
Pacificorp Vault————
PAD-424842"x48"x5"concrete——
PAD-445644"x56"x5"———
PAD-767676"x76"x8"concrete——
PAD-838383"x83"x6"———
PAD-949494"x94"x8"concrete——
PAD-SG-15KV4’-2” x 5’-0” x 1’-8” I.D.———
PAD-SG-15KV-ONCOR4’-2” x 5’-0” x 1’-8” I.D.———
PAD-SG-25KV5’-2” x 6’-4” x 1’-8” I.D.———
PB-41————
PE-LB-224” Dia. x 6’-6” x Variesprecast concrete——
PE-UV-44’ Dia x 4’-0”———
PE-V-57————
PE-V-59————
PE-V-60————
PE-V-61————
PE-V-6744"x54"x6———
PE-V-69————
PE-V-70————
PEST-2————
PEST-3————
PEUV-118’-0”x8’-0”xVaries I.D.———
PEV-43————
QWEST Padmounts1 under it————
SM-63716066x90———
SM-637162————
SM-63716310'x10'———
SR-233 Type I————
SR-233 Type II————
SR-240————
SRP Padmounts————
ST43204'-0"x20'-0"x3'-0" I.D.———
TEP Padmounts————
Transformer Pad-New England Power7’-0” x 7’-0” x 3’-0”———
V 88————

Documents

Where this comes from — 89 documents

A machine read this from documents Oldcastle Infrastructure, INC. publishes on its own website, as of October 16, 2026. FactoryRegistry has not verified it; the documents are the authority.