FactoryRegistry
Claim a page

Valley Packline Solutions

5259 Avenue 408, Reedley, CA 93654

UNVERIFIEDLAST OPERATING SIGNAL — · 2 SOURCES

Present in a source dataset, with no recent operating signal.

DirectionsClaim this pageGet the badge

What they make

Mining Machinery and Equipment Manufacturing333131

Where it is

Location not verified — this address could not be matched to Census TIGER, so the facility is not placed on the map.

COUNTY
METRO AREA
ON GOOGLE MAPS
STREET VIEW

Other plants nearby

No other listed facility within 40 km shares this one’s four-digit industry code, or this record has no coordinates to measure from.

Also at this address

No other federal record shares this street address.

Where this record comes from

2 sources hold this plant, and 8 fields on this page come from them. Each line is one source’s own record of it — an agency’s filing, a state registry or the company’s own website: the identifier it is filed under, whether that record shows the plant operating or only that it exists, and when the register first and last saw it there.

EPA cross-references this facility in OSHA-OIS, RCRAINFO · EPA site type STATIONARY.

  • SBA Paycheck Protection Program loan recordsEXISTENCE
    Record CA|reedley|5259 ave 408 · first seen MAY 2020 · last seen MAY 2020
  • EPA Facility Registry ServiceEXISTENCE
    Record 110070345282 · first seen SEP 2018 · last seen SEP 2018

IN FRESNO COUNTY26 other plants share this one’s industry (Agriculture, Construction, and Mining Machinery Manufacturing, NAICS 3331); 11 of them have a size band on record.

What each source says

Every field below, as each source filed it. The value this page shows is marked; where the sources disagree, the field says so. Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Name
EPA: VALLEY PACKLINE SOLUTIONS · NOV 2026
Street address
EPA: 5259 AVENUE 408 · NOV 2026
City
EPA: REEDLEY · NOV 2026
State
EPA: CA · NOV 2026
County (FIPS code)
EPA: 06019 · NOV 2026
Employees (band)
SBA PPP: 20-99 · MAY 2020
PPP loan
SBA PPP: PPP loan x1, approved 2020-05-08, 49 jobs reported · MAY 2020
Hazardous waste generator (RCRA)
EPA ECHO: none · NOV 2026

Correct this page · Request removal