Entegris
10070 Willow Creek Rd, San Diego, CA 92131
A closure has been reported but not corroborated.
- Plant closing notice effective DEC 31, 2018 · 16 employees · filed SEP 19, 2018 · Closure Permanent — this notice is why the plant is listed as reported closed
Notices filed with the state under the federal WARN Act, as the state publishes them, collected by the WARN Act notices feed (CC BY 4.0). A notice records what the employer told the state; it is not by itself proof that the plant closed.
What they make
Showcase, Partition, Shelving, and Locker Manufacturing337215Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Adaptaspace USA INC | San Diego | Office Furniture (except Wood) Manufacturing 337214 | ACTIVE | 3.2 KM |
| Hausfast LLC | San Diego | Electronic Computer Manufacturing 334111 | ACTIVE | 3.5 KM |
| Offisavvy, LLC | San Diego | Wood Office Furniture Manufacturing 337211 | ACTIVE | 4.4 KM |
| Surfacemode, INC | San Diego | Nonferrous Metal Foundries 331521 | LIKELY ACTIVE | 4.8 KM |
| Peninsula Industries Dba Closet Factory | San Diego | Showcase, Partition, Shelving, and Locker Manufacturing 337215 | UNVERIFIED | 5.0 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 7 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in CA-ENVIROVIEW, RCRAINFO · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| WARN | CLOSURE | DEC 2018 | DEC 2018 |
| EPA FRS | EXISTENCE | OCT 2015 | OCT 2015 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | SEP 2026 |
| CITY | EPA FRS | SEP 2026 |
| COUNTY FIPS | EPA FRS | SEP 2026 |
| GEOM | EPA FRS | SEP 2026 |
| NAME | EPA FRS | SEP 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | SEP 2026 |
| STATE | EPA FRS | SEP 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
