Lobato Construction - Mc-8t Plant
541 Energy Park Dr, Platteville, CO 80651
Present in a source dataset, with no recent operating signal.
What they make
Ready-Mix Concrete Manufacturing327320Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Oldcastle Infrastructure | Platteville | Ready-Mix Concrete Manufacturing 327320 | LIKELY ACTIVE | 0.6 KM |
| United Ready Mix - Platteville | Platteville | Other Concrete Product Manufacturing 327390 | UNVERIFIED | 1.3 KM |
| United Ready Mix | Platteville | Ready-Mix Concrete Manufacturing 327320 | LIKELY ACTIVE | 1.3 KM |
| Ready Mixed Concrete - Nix S&g Mine | Platteville | Ready-Mix Concrete Manufacturing 327320 | UNVERIFIED | 7.7 KM |
| Spn Well Services - Fort Lupton Facility | Fort Lupton Area | Ready-Mix Concrete Manufacturing 327320 | UNVERIFIED | 11.0 KM |
Also at this address
No other federal record shares this street address.
Where this record comes from
1 source holds this plant, and 5 fields on this page come from them. Each line is one agency’s own record of it: the identifier it is filed under, whether that record shows the plant operating or only that it exists, and when the register first and last saw it there.
EPA cross-references this facility in AIR · EPA site type PORTABLE.
- EPA Facility Registry ServiceEXISTENCERecord 110071949339 · first seen JUN 2025 · last seen JUN 2025
IN WELD COUNTY47 other plants share this one’s industry (Cement and Concrete Product Manufacturing, NAICS 3273); 4 of them have a size band on record.
What each source says
Every field below, as each source filed it. The value this page shows is marked; where the sources disagree, the field says so. Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
- Name
- EPA: LOBATO CONSTRUCTION - MC-8T PLANT · NOV 2026
- Street address
- EPA: 541 ENERGY PARK DR · NOV 2026
- City
- EPA: PLATTEVILLE · NOV 2026
- State
- EPA: CO · NOV 2026
- Coordinates
- EPA: 40.22945,-104.82323 · NOV 2026
