FactoryRegistry
Claim a page

Critical Path Metalworks INC

614 Cliff Street, Silver Cliff, CO 81252

UNVERIFIEDLAST SEEN IN FEDERAL DATA — · 2 SOURCES

Present in a source dataset, with no recent operating signal.

DirectionsClaim this pageGet the badge

What they make

Fabricated Structural Metal Manufacturing332312

Where it is

38.13708, -105.44448 · CENSUS TIGER
COUNTY
ON GOOGLE MAPS
STREET VIEW

Other plants nearby

No other listed facility within 40 km shares this one’s four-digit industry code, or this record has no coordinates to measure from.

Also at this address

No other federal record shares this street address.

Where this record comes from

2 sources hold this plant, and 9 fields on this page come from them. Each line is one agency’s own record of it: the identifier it is filed under, whether that record shows the plant operating or only that it exists, and when the register first and last saw it there.

EPA cross-references this facility in AIR, EIS, OSHA-OIS · EPA site type STATIONARY.

  • EPA Facility Registry ServiceEXISTENCE
    Record 110070341005 · first seen SEP 2018 · last seen SEP 2018
  • SBA 7(a) and 504 loan recordsEXISTENCE
    first seen DEC 2011 · last seen DEC 2011

What each source says

Every field below, as each source filed it. The value this page shows is marked; where the sources disagree, the field says so. Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Name
EPA: CRITICAL PATH METALWORKS INC · OCT 2026
Street address
EPA: 614 CLIFF STREET · OCT 2026
City
EPA: SILVER CLIFF · OCT 2026
State
EPA: CO · OCT 2026
County (FIPS code)
EPA: 08027 · OCT 2026
Coordinates
EPA: 38.13708,-105.44448 · OCT 2026
Year established
CO SOS: 2011 · NOV 2011
SBA loans
SBA: 7a loan x2, jobs 7.0 · DEC 2011
State business registration
CO SOS: Critical Path MetalWorks, Inc., registered with the Colorado Secretary of State; Corporation; formed 2011-11-02; dissolved 2018-11-30 · NOV 2018

Report a correction · Request removal