Pro-demo Aggregate Concrete Processing Facility
6306 Seminole Ave, Orlando, FL 32822
UNVERIFIEDLAST SEEN IN FEDERAL DATA — · 1 SOURCE
Present in a source dataset, with no recent operating signal.
What they make
All Other Miscellaneous Nonmetallic Mineral Product Manufacturing327999Where it is
28.47702, -81.29874 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Central Florida Marble LLC | Orlando | Cut Stone and Stone Product Manufacturing 327991 | UNVERIFIED | 0.4 KM |
| Ed Stone INC | Orlando | Cut Stone and Stone Product Manufacturing 327991 | UNVERIFIED | 0.5 KM |
| Edstone, INC | Orlando | Cut Stone and Stone Product Manufacturing 327991 | UNVERIFIED | 0.6 KM |
| New Source Corporation | Orlando | Alumina Refining and Primary Aluminum Production 331313 | ACTIVE | 2.0 KM |
| Florida Orlando Lee Vista Blvd | Orlando | Cut Stone and Stone Product Manufacturing 327991 | LIKELY ACTIVE | 6.5 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 1 FEDERAL SOURCE, 5 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in NPDES · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA FRS | EXISTENCE | SEP 2019 | SEP 2019 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
