FactoryRegistry
Claim a page

Florida Dep - Pharmco Hwcs #150

3520 South Street, Titusville, FL 32780

UNVERIFIEDLAST OPERATING SIGNAL NOV 2024 · 3 SOURCES

Present in a source dataset, with no recent operating signal.

DirectionsClaim this pageGet the badge

What they make

Pharmaceutical Preparation Manufacturing325412

Where it is

28.57859, -80.84753 · CENSUS TIGER
COUNTY
METRO AREA
ON GOOGLE MAPS

Other plants nearby

No other listed facility within 40 km shares this one’s four-digit industry code, or this record has no coordinates to measure from.

Also at this address

No other federal record shares this street address.

Where this record comes from

3 sources hold this plant, and 9 fields on this page come from them. Each line is one source’s own record of it — an agency’s filing, a state registry or the company’s own website: the identifier it is filed under, whether that record shows the plant operating or only that it exists, and when the register first and last saw it there.

EPA cross-references this facility in BR, FDM, NCDB, RCRAINFO, SSTS · EPA site type STATIONARY.

  • EPA ECHO compliance recordsOPERATING
    first seen NOV 2024 · last seen NOV 2024
  • SBA Paycheck Protection Program loan recordsEXISTENCE
    Record FL|titusville|3520 s st · first seen APR 2020 · last seen APR 2020
  • EPA Facility Registry ServiceEXISTENCE
    Record 110002538415 · first seen FEB 2016 · last seen FEB 2016

IN BREVARD COUNTY1 other plant shares this one’s industry (Pharmaceutical and Medicine Manufacturing, NAICS 3254); 0 of them have a size band on record.

What each source says

Every field below, as each source filed it. The value this page shows is marked; where the sources disagree, the field says so. Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Name
EPA: FLORIDA DEP - PHARMCO HWCS #150 · NOV 2026
Street address
EPA: 3520 SOUTH STREET · NOV 2026
City
EPA: TITUSVILLE · NOV 2026
State
EPA: FL · NOV 2026
County (FIPS code)
EPA: 12009 · NOV 2026
Coordinates
EPA: 28.578593,-80.847526 · NOV 2026
Employees (band)
SBA PPP: 1-19 · APR 2020
PPP loan
SBA PPP: PPP loan x1, approved 2020-04-13, 17 jobs reported · APR 2020
Hazardous waste generator (RCRA)
EPA ECHO: VSQG · NOV 2026

Correct this page · Request removal