Imperial Industries Premix Marbletite Manufacturing
325 Old Sanford Oviedo Road, Winter Springs, FL 32708
LIKELY ACTIVELAST SEEN IN FEDERAL DATA DEC 2025 · 2 SOURCES
Operating signal within 24 months, or from a single source.
What they make
Ready-Mix Concrete Manufacturing327320Where it is
28.70686, -81.29912 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Titan Florida-longwood Cbp (fka Tarmac-longwood Cbp) | Longwood | Ready-Mix Concrete Manufacturing 327320 | LIKELY ACTIVE | 5.7 KM |
| Maschmeyer Concrete CO of Florida INC | Casselberry | Ready-Mix Concrete Manufacturing 327320 | UNVERIFIED | 5.9 KM |
| Next Day Concrete | Longwood | Ready-Mix Concrete Manufacturing 327320 | LIKELY ACTIVE | 6.0 KM |
| Hhi | Sanford | Concrete Pipe Manufacturing 327332 | UNVERIFIED | 8.9 KM |
| Heavy Highway Infrastructure-sanford Plant | Sanford | Ready-Mix Concrete Manufacturing 327320 | LIKELY ACTIVE | 8.9 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, AIRS/AFS, NPDES · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| OSHA ITA | OPERATING | DEC 2025 | DEC 2025 |
| EPA FRS | EXISTENCE | OCT 2016 | OCT 2016 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| EMPLOYEE BAND | OSHA ITA | DEC 2025 |
| GEOM | CENSUS GEOCODER | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
