FactoryRegistry
Claim a page

Universal Alloy

199 Howell Bridge Road Extension, Ball Ground, GA 30107

UNVERIFIEDLAST SEEN IN FEDERAL DATA · 1 SOURCE

Present in a source dataset, with no recent operating signal.

DirectionsClaim this pageGet the badge

What they make

Other Aluminum Rolling, Drawing, and Extruding331318

Where it is

34.32867, -84.39674 · CENSUS TIGER
COUNTY
ON GOOGLE MAPS

Other plants nearby

FacilityCityIndustryStatusDistance
Universal Alloy Corporation - Ball GroundBall GroundOther Aluminum Rolling, Drawing, and Extruding
331318
LIKELY ACTIVE0.8 KM
Universal Alloy CorporationBall GroundOther Aluminum Rolling, Drawing, and Extruding
331318
LIKELY ACTIVE1.0 KM
Universal Alloy CorporationCantonAluminum Sheet, Plate, and Foil Manufacturing
331315
REPORTED CLOSED12.0 KM
Universal Alloy CorporationCantonAluminum Sheet, Plate, and Foil Manufacturing
331315
LIKELY ACTIVE12.0 KM
Canton, City of (canton Wpcp)CantonAlumina and Aluminum Production and Processing
331316
LIKELY ACTIVE14.7 KM

Every listed plant in Cherokee County

Also at this address

1 other record shares this street address. Separate filings can describe distinct businesses on one site, or the same plant recorded by different agencies, so every record is kept rather than merged away.

Universal Alloy Corporation - Ball Ground
Ball Ground, GA
LIKELY ACTIVE331318EMP 100-499
WHERE THIS RECORD COMES FROM — 1 FEDERAL SOURCE, 6 FIELDS

Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.

SourceEvidenceFirst seenLast seen
EPA FRSEXISTENCEAUG 2018AUG 2018
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
FIELDSOURCESIGNAL
ADDRESS LINE1EPA FRSSEP 2026
CITYEPA FRSSEP 2026
COUNTY FIPSEPA FRSSEP 2026
GEOMEPA FRSSEP 2026
NAMEEPA FRSSEP 2026
STATEEPA FRSSEP 2026

Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Report a correction · Request removal