Ga Power Plant R.w. Scherer
10986 Ga Hwy 87/u.s. Hwy 23, Juliette, GA 31046
LIKELY ACTIVELAST SEEN IN FEDERAL DATA APR 2026 · 3 SOURCES
Operating signal within 24 months, or from a single source.
What they make
Ready-Mix Concrete Manufacturing327320Where it is
33.06130, -83.80660 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Eagle Precast Georgia Facility | Forysth | Other Concrete Product Manufacturing 327390 | LIKELY ACTIVE | 10.9 KM |
| Lafarge Bolingbroke Concrete Plant | Bolingbroke | Ready-Mix Concrete Manufacturing 327320 | UNVERIFIED | 13.8 KM |
| Lafarge Roff Avenue Concrete Plant | Macon | Ready-Mix Concrete Manufacturing 327320 | UNVERIFIED | 27.4 KM |
| Webber - United, LLC | Macon | Ready-Mix Concrete Manufacturing 327320 | UNVERIFIED | 31.0 KM |
| Seminole Precast Manufacturing, INC. | Macon | Other Concrete Product Manufacturing 327390 | UNVERIFIED | 36.8 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 3 FEDERAL SOURCES, 5 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, AIRS/AFS, CAMDBS, CEDRI, E-GGRT, EGRID, EIA-860, ICIS, NPDES, SFDW, TRIS, TSCA · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA ECHO | OPERATING | APR 2026 | APR 2026 |
| EPA FRS | EXISTENCE | NOV 2024 | NOV 2024 |
| EPA TRI | OPERATING | DEC 2023 | DEC 2023 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
