Amitron CORP
2001 Landmeier Road, Elk Grove Village, IL 60007
UNVERIFIEDLAST SEEN IN FEDERAL DATA DEC 2023 · 3 SOURCES
Present in a source dataset, with no recent operating signal.
What they make
Bare Printed Circuit Board Manufacturing334412Where it is
42.00972, -87.95267 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Amitron, Inc. | Elk Grove Village | Bare Printed Circuit Board Manufacturing 334412 | UNVERIFIED | 0.1 KM |
| Circuit Systems, INC. | Elk Grove Village | Bare Printed Circuit Board Manufacturing 334412 | UNVERIFIED | 0.4 KM |
| Accelerated Assemblies, INC | Elk Grove Vlg | Printed Circuit Assembly (Electronic Assembly) Manufacturing 334418 | ACTIVE | 0.6 KM |
| Imagineering INC | Elk Grove Village | Printed Circuit Assembly (Electronic Assembly) Manufacturing 334418 | ACTIVE | 0.9 KM |
| Tingstol CO | Elk Grove Village | Electroplating, Plating, Polishing, Anodizing, and Coloring 332813 | UNVERIFIED | 1.1 KM |
Also at this address
1 other record shares this street address. Separate filings can describe distinct businesses on one site, or the same plant recorded by different agencies, so every record is kept rather than merged away.
WHERE THIS RECORD COMES FROM — 3 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in ACES, AIR, AIRS/AFS, BR, EIS, RCRAINFO, TRIS · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA TRI | OPERATING | DEC 2023 | DEC 2023 |
| EPA ECHO | OPERATING | OCT 2018 | OCT 2018 |
| EPA FRS | EXISTENCE | JUN 2017 | JUN 2017 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | SEP 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
