General Metal Finishing Bldg 2
23 Frank Mossberg Drive, Attleboro, MA 02703
LIKELY ACTIVELAST SEEN IN FEDERAL DATA — · 2 SOURCES
Operating signal within 24 months, or from a single source.
What they make
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers332812Where it is
41.91820, -71.32115 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| General Metal Finishing | Attleboro | Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers 332812 | UNVERIFIED | 0.1 KM |
| Interplex Etch Logic | Attleboro | Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers 332812 | LIKELY ACTIVE | 2.4 KM |
| Seekonk Manufacturing Company, INC. | Seekonk | Saw Blade and Handtool Manufacturing 332216 | LIKELY ACTIVE | 3.1 KM |
| Sweet Metal Finishing | Attleboro | Electroplating, Plating, Polishing, Anodizing, and Coloring 332813 | UNVERIFIED | 3.0 KM |
| Automated Finishing | Attleboro | Electroplating, Plating, Polishing, Anodizing, and Coloring 332813 | UNVERIFIED | 3.9 KM |
Also at this address
More than one federal record exists for this street address. The primary record for the site is listed first.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, AIRS/AFS, BR, MA-EPICS, RCRAINFO · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA ECHO | OPERATING | DEC 2025 | DEC 2025 |
| EPA FRS | EXISTENCE | MAY 2016 | MAY 2016 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | AUG 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
