FactoryRegistry
Claim a page

Paraclete Energy Incorporated

700 W Industrial Dr, Chelsea, MI 48118

ACTIVELAST SEEN IN FEDERAL DATA AUG 2026 · 2 SOURCES

Operating signal within 12 months from two or more independent sources.

Visit websiteDirectionsGo to companyClaim this pageGet the badge
Homepage of Paraclete Energy Incorporated
Their homepage, crawled AUG 2026

What they make

Battery Manufacturing335910

Paraclete Energy redefines propulsion solutions with its SILO Silicon™ material, a drop-in silicon anode designed for OEMs, cell are cell makers and strategic partners. The material offers step-change energy density and fast charge performance, demonstrating 2,834 mAh/g capacity. Built and manufactured in the USA, SILO Silicon™. are high-capacity silicon anode performance, manufacturing partnerships with technical documentation, sample evaluation

SUMMARIZED FROM THE COMPANY’S OWN WEBSITE

CAREERS
Careers page — seen SEP 8, 2026

Where it is

42.32127, -84.03302 · CENSUS TIGER
COUNTY
METRO AREA
ON GOOGLE MAPS
STREET VIEW

Other plants nearby

FacilityCityIndustryStatusDistance
Power 3d, INCDexterBattery Manufacturing
335910
ACTIVE9.8 KM
Navitas Advanced Solutions Group, LLCAnn ArborBattery Manufacturing
335910
LIKELY ACTIVE15.8 KM
Navitas Systems, LLCAnn ArborOther Electronic Component Manufacturing
334419
ACTIVE15.8 KM
Egi Battery INC.Ann ArborBattery Manufacturing
335910
LIKELY ACTIVE19.9 KM
Enpower Greentech INC.Ann ArborBattery Manufacturing
335910
UNVERIFIED19.9 KM

Every listed plant in Washtenaw County

Also at this address

No other federal record shares this street address.

WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 8 FIELDS

Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.

SourceEvidenceFirst seenLast seen
COMPANY SITEOPERATINGJUL 2026AUG 2026
SAM GOVOPERATINGJUN 2026JUN 2026
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
FIELDSOURCESIGNAL
ADDRESS LINE1SAM GOVJUN 2026
CAGE CODESAM GOVJUN 2026
CITYSAM GOVJUN 2026
GEOMCENSUS GEOCODERJUL 2026
NAMESAM GOVJUN 2026
REGISTRATION EXPIRATIONSAM GOVJUN 2026
STATESAM GOVJUN 2026
WEBSITESAM GOVJUN 2026

Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Report a correction · Request removal