Vitaldyne INC
400 Cokato St, Cokato, MN 55321
LIKELY ACTIVELAST SEEN IN FEDERAL DATA SEP 2026 · 4 SOURCES
Operating signal within 24 months, or from a single source.
What they make
Electronic Connector Manufacturing334417Products
Made or handled here · 1
Continuous Measurement ThermometerWhere these came from
1 from FDA device registration · Federal registry
FDA device establishment 3003697998, product code FLL
Where it is
45.08002, -94.19521 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Fox River Graphics LLC | Hutchinson | Electronic Computer Manufacturing 334111 | LIKELY ACTIVE | 24.7 KM |
| Tech-etch, INC | Litchfield | Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers 332812 | UNVERIFIED | 25.2 KM |
| Honeywell Electronic Materials INC | Buffalo | Bare Printed Circuit Board Manufacturing 334412 | UNVERIFIED | 28.6 KM |
| Cb Machining & Engineering INC | Buffalo | Machine Shops 332710 | ACTIVE | 29.0 KM |
| Laars Heating Systems - Electro Industries | Monticello | Bare Printed Circuit Board Manufacturing 334412 | UNVERIFIED | 38.8 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 4 FEDERAL SOURCES, 7 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in MN-TEMPO, RCRAINFO, TRIS · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| FDA DEVICES | OPERATING | AUG 2026 | SEP 2026 |
| EPA ECHO | OPERATING | NOV 2023 | NOV 2023 |
| EPA FRS | EXISTENCE | JUN 2016 | SEP 2018 |
| SBA LOANS | EXISTENCE | NOV 2015 | NOV 2015 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | SEP 2026 |
| SBA LOAN | SBA LOANS | NOV 2015 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
