Valley Material Company-valley Park
201 Marshall Rd, Valley Park, MO 63088
LIKELY ACTIVELAST SEEN IN FEDERAL DATA APR 2026 · 3 SOURCES
Operating signal within 24 months, or from a single source.
What they make
Ready-Mix Concrete Manufacturing327320Where it is
38.54859, -90.48932 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Metro Materials (valley Park Plant)-fenton Supply Company | Valley Park | Ready-Mix Concrete Manufacturing 327320 | UNVERIFIED | 0.8 KM |
| Metro Materials Concrete Batch Plant | Valley Park | Ready-Mix Concrete Manufacturing 327320 | UNVERIFIED | 0.8 KM |
| STL Quikrete | Valley Park | Other Concrete Product Manufacturing 327390 | LIKELY ACTIVE | 0.9 KM |
| Gold Star Paving-wentzville | Wentzville | Ready-Mix Concrete Manufacturing 327320 | UNVERIFIED | 3.3 KM |
| Landvatter Ready Mix-barrett Station Road | Saint Louis | Ready-Mix Concrete Manufacturing 327320 | UNVERIFIED | 3.7 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 3 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, AIRS/AFS, EIS, MO-DNR, NPDES, OSHA-OIS · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA ECHO | OPERATING | APR 2026 | APR 2026 |
| SBA LOANS | EXISTENCE | MAR 2021 | MAR 2021 |
| EPA FRS | EXISTENCE | JUN 2017 | JUN 2017 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| SBA LOAN | SBA LOANS | MAR 2021 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
