Argos Ready Mix - Carrboro Plant (no 16)
219 Guthrie Avenue, Carrboro, NC 27510
UNVERIFIEDLAST SEEN IN FEDERAL DATA AUG 2000 · 2 SOURCES
Present in a source dataset, with no recent operating signal.
What they make
Ready-Mix Concrete Manufacturing327320Where it is
35.90868, -79.06718 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Chandler Concrete CO. INC. - Hillsborough | Hillsborough | Ready-Mix Concrete Manufacturing 327320 | UNVERIFIED | 15.9 KM |
| Southern Equipment CO (dba Rmcc) - Hillsborough - Plant #53 | Hillsborough | Ready-Mix Concrete Manufacturing 327320 | LIKELY ACTIVE | 17.1 KM |
| Argos Ready Mix Hwy 55 Concrete Plant | Durham | Ready-Mix Concrete Manufacturing 327320 | UNVERIFIED | 16.3 KM |
| Southern Equipment CO - Durham Concrete Plant 14 | Durham | Cement Manufacturing 327310 | LIKELY ACTIVE | 18.5 KM |
| S. T. Wooten Corporation/apex Plant -plant No. 18 | Apex | Ready-Mix Concrete Manufacturing 327320 | UNVERIFIED | 21.1 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 5 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, AIRS/AFS · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA FRS | EXISTENCE | JUN 2017 | JUN 2017 |
| EPA ECHO | OPERATING | AUG 2000 | AUG 2000 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
