FactoryRegistry
Claim a page

Asco Power Technologies LP

325 Welcome Center Blvd, Lexington, NC 27295

ACTIVELAST SEEN IN FEDERAL DATA OCT 2026 · 5 SOURCES

Operating signal within 12 months from two or more independent sources.

Visit websiteDirectionsGo to companyClaim this pageGet the badge
Homepage of Asco Power Technologies LP
Their homepage, crawled JUL 2026

What they make

Sheet Metal Work Manufacturing332322
  • critical power products
  • transfer switches
  • quick connects

NAMED ON THE COMPANY’S OWN WEBSITE, READ JUL 29, 2026

Where it is

35.93188, -80.23557 · CENSUS TIGER
COUNTY
METRO AREA
ON GOOGLE MAPS

Other plants nearby

FacilityCityIndustryStatusDistance
Matcor Metal FabricationWelcomeFabricated Structural Metal Manufacturing
332312
LIKELY ACTIVE4.2 KM
Genesis Metalworks INCLexingtonSheet Metal Work Manufacturing
332322
UNVERIFIED11.4 KM
Winston Steel, LLC - Junia LocationWinston SalemFabricated Structural Metal Manufacturing
332312
LIKELY ACTIVE15.5 KM
129006 - Swaim Ornamental Iron Works, INC.Winston SalemOrnamental and Architectural Metal Work Manufacturing
332323
LIKELY ACTIVE14.5 KM
Carolina Steel CORPWinston-salemFabricated Structural Metal Manufacturing
332312
LIKELY ACTIVE16.0 KM

Every listed plant in Davidson County

Also at this address

No other federal record shares this street address.

Where this record comes from

5 sources hold this plant, and 10 fields on this page come from them. Each line is one agency’s own record of it: the identifier it is filed under, whether that record shows the plant operating or only that it exists, and when the register first and last saw it there.

EPA cross-references this facility in EIS, NC-FITS, NPDES, RCRAINFO, TRIS · EPA site type STATIONARY.

  • The company’s own websiteOPERATING
    first seen JUL 2026 · last seen OCT 2026
  • SAM.gov entity registrationOPERATING
    Record KN2BBGWNLKJ8 · first seen JUN 2026 · last seen JUN 2026
  • OSHA injury and illness reportsOPERATING
    Record 364044 · first seen DEC 2025 · last seen DEC 2025
  • EPA Toxics Release InventoryOPERATING
    first seen DEC 2023 · last seen DEC 2024
  • EPA Facility Registry ServiceEXISTENCE
    Record 110006722029 · first seen JUN 2015 · last seen SEP 2018

ALSO RECORDED AS129817 - ASCO POWER TECHNOLOGIES, LIMITED PARTNERSHIP; ASCO POWER TECHNOLOGIES, LIMITED PARTNERSHIP; EMERSON ELECTRIC CO. - ASCO POWER TECHNO

IN DAVIDSON COUNTY10 other plants share this one’s industry (Architectural and Structural Metals Manufacturing, NAICS 3323); 7 of them have a size band on record.

What each source says

Every field below, as each source filed it. The value this page shows is marked; where the sources disagree, the field says so. Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

NameSOURCES DISAGREE
EPA: ASCO POWER TECHNOLOGIES, LIMITED PARTNERSHIP · JUL 2026
SAM.gov: ASCO POWER TECHNOLOGIES LP · JUN 2026 · ON THIS PAGE
Street addressSOURCES DISAGREE
EPA: 325 WELCOME CENTER BOULEVARD · JUL 2026
SAM.gov: 325 WELCOME CENTER BLVD · JUN 2026 · ON THIS PAGE
City
EPA: LEXINGTON · JUL 2026 · ON THIS PAGE
SAM.gov: LEXINGTON · JUN 2026 · ON THIS PAGE
State
EPA: NC · JUL 2026 · ON THIS PAGE
SAM.gov: NC · JUN 2026 · ON THIS PAGE
County (FIPS code)
EPA: 37057 · SEP 2026
CoordinatesSOURCES DISAGREE
Census geocoder: 35.931883208654,-80.235571805742 · JUL 2026 · ON THIS PAGE
EPA: 35.93025,-80.23688 · JUL 2026
Employees (band)
OSHA: 500+ · DEC 2025
Website
SAM.gov: www.ascopower.com · JUN 2026
CAGE code
SAM.gov: 60QT4 · JUN 2026
SAM registration expires
SAM.gov: 2027-06-09 · JUN 2026

Report a correction · Request removal