FactoryRegistry
Claim a page

Aegis Power Systems INC

805 Greenlawn Cemetery Rd, Murphy, NC 28906

ACTIVELAST SEEN IN FEDERAL DATA OCT 2026 · 4 SOURCES

Operating signal within 12 months from two or more independent sources.

Visit websiteDirectionsGo to companyClaim this pageGet the badge
Homepage of Aegis Power Systems INC
Their homepage, crawled JUL 2026

What they make

All Other Miscellaneous Electrical Equipment and Component Manufacturing335999
  • 1-Phase AC-DC
  • 3-Phase AC
  • DC-DC
  • military
  • embedded computing
  • experience creating custom products

NAMED ON THE COMPANY’S OWN WEBSITE, READ JUL 29, 2026

Products

Sold by AEGIS POWER SYSTEMS INC · 4
Converters, Electrical, Nonrotating · Converters, Electrical, Rotating · Electrical And Electronic Assemblies, Boards, Cards, And Associated Hardware · Miscellaneous Electric Power And Distribution Equipment

Recorded against the company rather than this address. Federal award and drug records name the company, not the plant, so we cannot say which of its sites makes these.

Where these came from
4 from usaspending_psc · Federal registry
Supplied under federal award N6449825P2138 (2025-07-31), PSC . An award shows what the government bought from this company; it does not establish which of its sites made it.
CAREERS
Careers page — seen SEP 8, 2026

CERTIFICATIONS — LISTED ON THE COMPANY’S WEBSITE

  • AS9100
  • ISO 9001
  • MIL-STD

Read from this company’s own website on August 9, 2026. Nobody at the facility has confirmed it here, and FactoryRegistry has not verified these — unlike operating status, which comes from independent public records. A certificate can lapse without the website changing, so ask the facility for current ones.

Where it is

35.09207, -83.94897 · CENSUS TIGER
COUNTY
ON GOOGLE MAPS

Other plants nearby

FacilityCityIndustryStatusDistance
Coleman CableHayesvilleOther Communication and Energy Wire Manufacturing
335929
UNVERIFIED12.9 KM

Every listed plant in Cherokee County

Also at this address

No other federal record shares this street address.

Where this record comes from

4 sources hold this plant, and 12 fields on this page come from them. Each line is one agency’s own record of it: the identifier it is filed under, whether that record shows the plant operating or only that it exists, and when the register first and last saw it there.

  • The company’s own websiteOPERATING
    first seen JUL 2026 · last seen OCT 2026
  • SAM.gov entity registrationOPERATING
    Record C8V6T36LW557 · first seen MAY 2026 · last seen SEP 2026
  • SBA 7(a) and 504 loan recordsEXISTENCE
    first seen JUN 2021 · last seen JUN 2021
  • SBA Paycheck Protection Program loan recordsEXISTENCE
    Record NC|murphy|805 greenlawn cemetery rd · first seen JAN 2021 · last seen JAN 2021

What each source says

Every field below, as each source filed it. The value this page shows is marked; where the sources disagree, the field says so. Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Name
SAM.gov: AEGIS POWER SYSTEMS INC · SEP 2026
Street address
SAM.gov: 805 GREENLAWN CEMETERY RD · SEP 2026
City
SAM.gov: MURPHY · SEP 2026
State
SAM.gov: NC · SEP 2026
Coordinates
Census geocoder: 35.09206757944,-83.948969959889 · JUL 2026
Employees (band)
SBA PPP: 20-99 · JAN 2021
Website
SAM.gov: https://www.aegispower.com · SEP 2026
Year established
Company website: 1995 · AUG 2026
CAGE code
SAM.gov: 06ES8 · SEP 2026
PPP loan
SBA PPP: PPP loan x2, approved 2021-01-21, 26 jobs reported · JAN 2021
SAM registration expires
SAM.gov: 2027-08-23 · SEP 2026
SBA loans
SBA: 7a loan x1, jobs 25.0 · JUN 2021

Report a correction · Request removal