Fusion INC Plant No 2
4711 Topps Indl. Pky., Willoughby, OH 44094
UNVERIFIEDLAST SEEN IN FEDERAL DATA DEC 2023 · 3 SOURCES
Present in a source dataset, with no recent operating signal.
What they make
Secondary Smelting and Alloying of Aluminum331314Where it is
41.62978, -81.43736 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Eckart America CORP | Painesville | Printing Ink Manufacturing 325910 | ACTIVE | 20.8 KM |
| Rol Fab INC | Cleveland | Metal Tank (Heavy Gauge) Manufacturing 332420 | ACTIVE | 25.1 KM |
| Clifton Steel CO | Maple Heights | Plate Work Manufacturing 332313 | ACTIVE | 27.5 KM |
| Victory White Metal | Cleveland | Secondary Smelting and Alloying of Aluminum 331314 | UNVERIFIED | 24.7 KM |
| Federal Metal CO | Bedford | Secondary Smelting and Alloying of Aluminum 331314 | ACTIVE | 29.8 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 3 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in BR, EIS, OH-CORE, RCRAINFO, TRIS · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA TRI | OPERATING | DEC 2023 | DEC 2023 |
| EPA FRS | EXISTENCE | JUN 2017 | JUN 2017 |
| EPA ECHO | OPERATING | APR 2010 | APR 2010 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | SEP 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
