Agc Mfg Svc INC / Broken Arrow Test Facility
20701 E 81st St, Broken Arrow, OK 74014
UNVERIFIEDLAST SEEN IN FEDERAL DATA — · 2 SOURCES
Present in a source dataset, with no recent operating signal.
What they make
Turbine and Turbine Generator Set Units Manufacturing333611Where it is
36.04639, -95.74584 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Finishing Line Machining | Broken Arrow | Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing 333612 | UNVERIFIED | 2.7 KM |
| Solar Turbines Broken Arrow | Broken Arrow | Turbine and Turbine Generator Set Units Manufacturing 333611 | LIKELY ACTIVE | 8.9 KM |
| Branch #11 Tulsa | Tulsa | Other Engine Equipment Manufacturing 333618 | LIKELY ACTIVE | 13.6 KM |
| Arlington Precision Components, LLC | Tulsa | Machine Shops 332710 | ACTIVE | 14.4 KM |
| L3harris Maritime Power & Energy Solutions, INC. | Tulsa | Switchgear and Switchboard Apparatus Manufacturing 335313 | LIKELY ACTIVE | 14.4 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 5 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, AIRS/AFS · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA ECHO | OPERATING | JUN 2020 | JUN 2020 |
| EPA FRS | EXISTENCE | JAN 2015 | JAN 2015 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
