Cutler Hammer Greenwood
2210 Laurens Highway 221 East, Greenwood, SC 29646
UNVERIFIEDLAST SEEN IN FEDERAL DATA DEC 2023 · 3 SOURCES
Present in a source dataset, with no recent operating signal.
What they make
Switchgear and Switchboard Apparatus Manufacturing335313Where it is
34.19333, -82.15833 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Greenwood Fabricating & Plating LLC | Greenwood | Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers 332812 | LIKELY ACTIVE | 0.7 KM |
| Culter Hammer-pcso Division | Greenwood | Switchgear and Switchboard Apparatus Manufacturing 335313 | UNVERIFIED | 0.7 KM |
| Leading Lady D Logistics LLC | Greenwood | All Other Miscellaneous Electrical Equipment and Component Manufacturing 335999 | LIKELY ACTIVE | 3.6 KM |
| Eaton Corporation - Lake Greenwood | Greenwood | Switchgear and Switchboard Apparatus Manufacturing 335313 | UNVERIFIED | 10.7 KM |
| Goodrich Corporation Turbine Component Service | Hodges | Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers 332812 | LIKELY ACTIVE | 14.8 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 3 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, NPDES, RCRAINFO, SC-EFIS, TRIS.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA TRI | OPERATING | DEC 2023 | DEC 2023 |
| EPA ECHO | OPERATING | JUN 2023 | JUN 2023 |
| EPA FRS | EXISTENCE | MAR 2003 | MAR 2003 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | SEP 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
