FactoryRegistry
Claim a page

Midwest Ready Mix

1405 East Highway 50, Vermillion, SD 57069

UNVERIFIEDLAST SEEN IN FEDERAL DATA SEP 2016 · 3 SOURCES

Present in a source dataset, with no recent operating signal.

DirectionsClaim this pageGet the badge

What they make

Ready-Mix Concrete Manufacturing327320

Where it is

42.79159, -96.91187 · CENSUS TIGER
COUNTY
METRO AREA
ON GOOGLE MAPS

Other plants nearby

FacilityCityIndustryStatusDistance
Thermo Bond Buildings LLCElk PointPrefabricated Wood Building Manufacturing
321992
ACTIVE20.9 KM
Gcc Alliance Concrete Inc-akronAkronReady-Mix Concrete Manufacturing
327320
UNVERIFIED29.0 KM
Concrete Materials CompanyYanktonAsphalt Paving Mixture and Block Manufacturing
324121
LIKELY ACTIVE37.8 KM

Every listed plant in Clay County

Also at this address

No other federal record shares this street address.

Where this record comes from

3 sources hold this plant, and 8 fields on this page come from them. Each line is one agency’s own record of it: the identifier it is filed under, whether that record shows the plant operating or only that it exists, and when the register first and last saw it there.

EPA cross-references this facility in AIR, AIRS/AFS · EPA site type STATIONARY.

  • SBA Paycheck Protection Program loan recordsEXISTENCE
    Record SD|vermillion|1405 e sd hwy 50 · first seen APR 2020 · last seen APR 2020
  • EPA ECHO compliance recordsOPERATING
    first seen SEP 2016 · last seen SEP 2016
  • EPA Facility Registry ServiceEXISTENCE
    Record 110038106741 · first seen JAN 2015 · last seen JAN 2015

What each source says

Every field below, as each source filed it. The value this page shows is marked; where the sources disagree, the field says so. Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Name
EPA: MIDWEST READY MIX · OCT 2026
Street address
EPA: 1405 EAST HIGHWAY 50 · OCT 2026
City
EPA: VERMILLION · OCT 2026
State
EPA: SD · OCT 2026
County (FIPS code)
EPA: 46027 · OCT 2026
Coordinates
Census geocoder: 42.791590735814,-96.911873087761 · AUG 2026
Employees (band)
SBA PPP: 1-19 · APR 2020
PPP loan
SBA PPP: PPP loan x1, approved 2020-04-14, 12 jobs reported · APR 2020

Report a correction · Request removal