FactoryRegistry
Claim a page

Schneider Electric Systems USA INC

1602 Mustang Dr, Maryville, TN 37801

ACTIVELAST SEEN IN FEDERAL DATA AUG 2026 · 2 SOURCES

Operating signal within 12 months from two or more independent sources.

Visit websiteDirectionsGo to companyClaim this pageGet the badge
Homepage of Schneider Electric Systems USA INC
Their homepage, crawled AUG 2026

What they make

Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables334513

Schneider Electric provides products and systems for low voltage, residential and small business, industrial-Sekunden. The company works with automation and control systems, power distribution, and energy storage.I navigation and protection relays. It offers uninterruptible power supplies, variable speed drives, and power metering systems.

SUMMARIZED FROM THE COMPANY’S OWN WEBSITE

Where it is

35.75673, -84.00963 · CENSUS TIGER
COUNTY
METRO AREA
ON GOOGLE MAPS

Other plants nearby

FacilityCityIndustryStatusDistance
Surface Igniter, LLCMaryvilleAutomatic Environmental Control Manufacturing for Residential, Commercial, and Appliance Use
334512
LIKELY ACTIVE0.5 KM
Denso Manufacturing Tennessee INC.MaryvilleTotalizing Fluid Meter and Counting Device Manufacturing
334514
LIKELY ACTIVE0.8 KM
Dcs Electronics, INC.MaryvilleSheet Metal Work Manufacturing
332322
ACTIVE1.2 KM
Samaritan Diagnostics LLCMaryvilleOther Measuring and Controlling Device Manufacturing
334519
UNVERIFIED4.2 KM
Pronova Solutions, LLCMaryvilleIrradiation Apparatus Manufacturing
334517
ACTIVE8.2 KM

Every listed plant in Blount County

Also at this address

No other federal record shares this street address.

WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 8 FIELDS

Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.

SourceEvidenceFirst seenLast seen
COMPANY SITEOPERATINGJUL 2026AUG 2026
SAM GOVOPERATINGOCT 2025OCT 2025
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
FIELDSOURCESIGNAL
ADDRESS LINE1SAM GOVOCT 2025
CAGE CODESAM GOVOCT 2025
CITYSAM GOVOCT 2025
GEOMCENSUS GEOCODERJUL 2026
NAMESAM GOVOCT 2025
REGISTRATION EXPIRATIONSAM GOVOCT 2025
STATESAM GOVOCT 2025
WEBSITESAM GOVOCT 2025

Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Report a correction · Request removal