US Tsubaki
250 Kirby Dr., Portland, TN 37148
UNVERIFIEDLAST SEEN IN FEDERAL DATA JUL 2012 · 2 SOURCES
Present in a source dataset, with no recent operating signal.
What they make
Conveyor and Conveying Equipment Manufacturing333922Where it is
36.59885, -86.51480 · CENSUS TIGER
COUNTY
ON GOOGLE MAPS
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| US Tsubaki Automotive, LLC - Portland, TN | Portland | Conveyor and Conveying Equipment Manufacturing 333922 | LIKELY ACTIVE | 0.4 KM |
| Usti-tn (hq) | Portland | Conveyor and Conveying Equipment Manufacturing 333922 | LIKELY ACTIVE | 0.4 KM |
| Aladdin Temp-rite LLC | Hendersonville | Polystyrene Foam Product Manufacturing 326140 | REPORTED CLOSED | 33.0 KM |
| Equipment Depot Kentucky - Bowling Green | Bowling Green | Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing 333924 | LIKELY ACTIVE | 35.7 KM |
| Stoody Company | Bowling Green | Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) 331492 | UNVERIFIED | 36.7 KM |
Also at this address
1 other record shares this street address. Separate filings can describe distinct businesses on one site, or the same plant recorded by different agencies, so every record is kept rather than merged away.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, AIRS/AFS, NPDES, RCRAINFO · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA FRS | EXISTENCE | JAN 2022 | JAN 2022 |
| EPA ECHO | OPERATING | JUL 2012 | JUL 2012 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | SEP 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
