Dallas Overhaul Center
215 E Centre Park Blvd, Desoto, TX 75115
LIKELY ACTIVELAST SEEN IN FEDERAL DATA DEC 2025 · 2 SOURCES
Operating signal within 24 months, or from a single source.
What they make
Turbine and Turbine Generator Set Units Manufacturing333611Where it is
32.62659, -96.85298 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Desoto Overhaul Facility | Desoto | Turbine and Turbine Generator Set Units Manufacturing 333611 | UNVERIFIED | 0.1 KM |
| Solar Turbines Dallas Overhaul Center | Desoto | Turbine and Turbine Generator Set Units Manufacturing 333611 | LIKELY ACTIVE | 0.6 KM |
| Sew-eurodrive | Desoto | Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing 333612 | LIKELY ACTIVE | 0.9 KM |
| Safran Power Units Dallas, INC. | Grand Prairie | Turbine and Turbine Generator Set Units Manufacturing 333611 | ACTIVE | 20.7 KM |
| Janat Alwatan INC. | Arlington | Bolt, Nut, Screw, Rivet, and Washer Manufacturing 332722 | LIKELY ACTIVE | 22.6 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in E-GGRT · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| OSHA ITA | OPERATING | DEC 2025 | DEC 2025 |
| EPA FRS | EXISTENCE | MAR 2019 | MAR 2019 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| EMPLOYEE BAND | OSHA ITA | DEC 2025 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
