US Titanium
2820 Patrick Henry Highway, Rte 151, Piney River, VA 22964
UNVERIFIEDLAST SEEN IN FEDERAL DATA — · 2 SOURCES
Present in a source dataset, with no recent operating signal.
What they make
Other Basic Inorganic Chemical Manufacturing325180Where it is
37.70833, -79.01666 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Bwxt Nuclear Operations Group, INC. | Lynchburg | Power Boiler and Heat Exchanger Manufacturing 332410 | ACTIVE | 32.5 KM |
| Framatome INC. | Lynchburg | Other Basic Inorganic Chemical Manufacturing 325188 | LIKELY ACTIVE | 33.2 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in BR, ICIS, RCRAINFO · EPA site type CONTAMINATED SITE.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA ECHO | OPERATING | MAY 2024 | MAY 2024 |
| EPA FRS | EXISTENCE | FEB 2016 | FEB 2016 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | AUG 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
