FactoryRegistry
Claim a page

Bp Cherry Point Refinery Final Effluent Integrity Management Project - Phase 3

4519 Grandview Rd, Blaine, WA 98230

UNVERIFIEDLAST SEEN IN FEDERAL DATA — · 1 SOURCE

Present in a source dataset, with no recent operating signal.

DirectionsClaim this pageGet the badge

What they make

Petroleum Refineries324110

Where it is

48.88400, -122.73500 · CENSUS TIGER
COUNTY
METRO AREA
ON GOOGLE MAPS

Other plants nearby

FacilityCityIndustryStatusDistance
Bp Cherry Point RefineryBlainePetroleum Refineries
324110
ACTIVE0.9 KM
Treoil IndustriesFerndalePetroleum Lubricating Oil and Grease Manufacturing
324191
UNVERIFIED1.9 KM
Phillips 66 RefineryFerndalePetroleum Refineries
324110
ACTIVE6.8 KM
Whatcom Builders INCBellinghamAsphalt Paving Mixture and Block Manufacturing
324121
UNVERIFIED21.0 KM
Singer PlantEversonAsphalt Paving Mixture and Block Manufacturing
324121
LIKELY ACTIVE27.0 KM

Every listed plant in Whatcom County

Also at this address

More than one federal record exists for this street address. The primary record for the site is listed first.

Bp Cherry Point Refinery
Blaine, WA
ACTIVE324110EMP 500+
Wa317935426 - B P West Coast Products LLC
Blaine, WA
UNVERIFIED324110

Where this record comes from

1 source holds this plant, and 5 fields on this page come from them. Each line is one agency’s own record of it: the identifier it is filed under, whether that record shows the plant operating or only that it exists, and when the register first and last saw it there.

EPA cross-references this facility in EIS, WA-FSIS · EPA site type STATIONARY.

  • EPA Facility Registry ServiceEXISTENCE
    Record 110071650865 · first seen FEB 2024 · last seen FEB 2024

IN WHATCOM COUNTY8 other plants share this one’s industry (Petroleum and Coal Products Manufacturing, NAICS 3241); 3 of them have a size band on record.

What each source says

Every field below, as each source filed it. The value this page shows is marked; where the sources disagree, the field says so. Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Name
EPA: BP CHERRY POINT REFINERY FINAL EFFLUENT INTEGRITY MANAGEMENT PROJECT - PHASE 3 · OCT 2026
Street address
EPA: 4519 GRANDVIEW RD · OCT 2026
City
EPA: BLAINE · OCT 2026
State
EPA: WA · OCT 2026
Coordinates
EPA: 48.884,-122.735 · OCT 2026

Report a correction · Request removal