FactoryRegistry
Claim a page

Burgess Norton Mfg CO Plant #4

201 Industrial Dr, Beaver Dam, WI 53916

LIKELY ACTIVELAST SEEN IN FEDERAL DATA DEC 2025 · 3 SOURCES

Operating signal within 24 months, or from a single source.

DirectionsClaim this pageGet the badge

What they make

Powder Metallurgy Part Manufacturing332117

Where it is

43.47714, -88.83324 · CENSUS TIGER
COUNTY
METRO AREA
ON GOOGLE MAPS
STREET VIEW

Other plants nearby

FacilityCityIndustryStatusDistance
Mayville Engineering Company, INC.Beaver DamMetal Crown, Closure, and Other Metal Stamping (except Automotive)
332119
UNVERIFIED1.0 KM
Mayville Engineering Company Inc- BeaverBeaver DamForging and Stamping
332116
LIKELY ACTIVE1.8 KM
Tenneco INC.WaupunForging and Stamping
332110
UNVERIFIED17.6 KM
Tenneco - WaupunWaupunPowder Metallurgy Part Manufacturing
332117
LIKELY ACTIVE17.6 KM
John Deere Horicon Works - 101 BuildingHoriconForging and Stamping
332110
UNVERIFIED16.1 KM

Every listed plant in Dodge County

Also at this address

No other federal record shares this street address.

WHERE THIS RECORD COMES FROM — 3 FEDERAL SOURCES, 7 FIELDS

Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.

EPA cross-references this facility in EIS, RCRAINFO, TRIS, WI-ESR · EPA site type STATIONARY.

SourceEvidenceFirst seenLast seen
OSHA ITAOPERATINGDEC 2025DEC 2025
EPA TRIOPERATINGDEC 2023DEC 2023
EPA FRSEXISTENCEJUN 2017JUN 2017
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
FIELDSOURCESIGNAL
ADDRESS LINE1EPA FRSJUL 2026
CITYEPA FRSJUL 2026
EMPLOYEE BANDOSHA ITADEC 2025
GEOMCENSUS GEOCODERJUL 2026
GEOMEPA FRSJUL 2026
NAMEEPA FRSJUL 2026
RCRA GENERATOR STATUSEPA ECHOSEP 2026
STATEEPA FRSJUL 2026

Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Report a correction · Request removal