Product family
Modular steel bridge
Made by Acrow Corporation of America · Parsippany, NJ
Its documents name it and state no specifications.
From Acrow Corporation of America’s own documents · read October 12, 2026 · not verified by FactoryRegistry
41 families in Modular steel bridge
110‑ft 30‑ft Temporary Acrow BridgePins: electro‑galvanizedSize: 110ft x30ft
390 ft Rental Detour BridgePins: electro galvanizedBolts: hot‑dip galvanized
700XS temporary bridgeSize: 130'x24'Material: steel
Acrow 190‑ft HS20 BridgeBolts: AASHTO M164M – A325Width: 18ftBolts specificationBolt: hot‑dip galvanizedSpec: AASHTO M164M‑A325
Bridge erection methodMethod: cantileverErection: segmental liftBridge finishFinish: galvanizedStandard: AASHTO M111Bridge lengthSize: 82.3mLength: 125ftBridge widthSize: 5m
Charles River temporary bridgesDDR2 bridgeDeck: epoxy non-skid coatedPins: electro‑galvanized
Deck surfaceDeck: noneType: crowned
Delta bridgeWidth: 24ft+5ft footwalkLength: 221.5ft
Design ADesign: AStandard: AASHTO M223 GD65Design BDesign: BStandard: AASHTO GD50
Design CDesign: CStandard: ASTM A193 GD b7Design DDesign: DStandard: AASHTO M164M
Design loadLoad: HL-93Truck: 60MT
Design load CL-625-ONTDesign load: CL-625-ONTEmergency bridge setFinishFinish: galvanizedStandard: AASHTO M111
Floating bridgeGuide railsType: TL-4Guide rails: TL-3
Launch methodMethod: cantilever launchNose length: 48.7m
Live loadCapacity: 10MTLive load: CL-625
Mabey Universal bridge
Mabey Universal panel bridgePins: electrogalvanizedBolts: hot‑dip galvanizedMeeks Bridge (permanent)Length: 180',width=24',guardrail=TL4,deck=Epoxy aggregate,erection=Crane-assisted launch,design_load=CL-625 ONT,finish=galvanizeMissouri Wind Farm temporary bridges
Modular steel towersMaterial: steelPanel pins specificationSpec: ASTM A193 GD B7Pin standard: ASTM A193 GD B7
Permanent Acrow BridgeLoad: HS15Width: 12ftPermanent Acrow Bridge – Îles CorbeilsPins: electro‑galvanizedBolts: hot‑dip galvanized
Shoring towersCount: 6Standard finishPins: electrogalvanizedBolts: hot_dipTDR3 bridgeDeck: epoxy-aggregate coatedPins: electro‑galvanized
Temporary Acrow BridgeTemporary Bridge #1Width: 31ftLength: 450ftTemporary Bridge #3Width: 30ftLength: 132ft
Truss SystemSize: 265ftMaterial: steelZambia Bridge Development Program
50 models
| Model | Length | Width | Finish | Pins | |
|---|---|---|---|---|---|
| 80‑ft Detour Bridge (Okfuskee County) | 80ft | 30ft | galvanized | electrogalvanized | |
| 110 ft 20 ft wide Temporary Acrow Bridge1 under it | 110ft | 20ft | galvanized | — | |
| 110 ft 24 ft wide Temporary Acrow Bridge | 110ft | 24ft | galvanized | — | |
| 130‑ft Temporary Detour Bridge | 130',width=24',deck=Asphalt overlay,erection=Crane-assisted launch,design_load=PHL 93 + P82,finish=galvanized,bolts=hot‑ | — | — | — | |
| 140‑ft Modular Bridge | 140ft | 30ft | galvanized | electrogalvanized | |
| 150' Pedestrian Bridge | 150',width=6.3',deck_surface=Galvanized steel grating,design_load=Pedestrian load (4kPa),finish=galvanized,bolts=hot‑dip | — | — | — | |
| 160‑ft Clear Span Bridge | 160ft | 24ft | — | — | |
| 200‑ft Acrow Bridge – Lusk WY | 200 ft | 24 ft | galvanized | electro‑galvanized | |
| 200‑ft Acrow modular detour bridge2 under it | 200 ft | 30 ft | galvanized | electro galvanized | |
| 200‑ft Temporary Detour Bridge (Iowa) | 200ft | 30ft | galvanized | electro galvanized | |
| 220‑ft Acrow bridge for Kealakaha | 220ft | 12ft8.5in | galvanized | — | |
| 320‑ft Detour Bridge I‑75 | 320ft | 36ft | galvanized | — | |
| Acrow 30.48 m Modular Bridge | 30.48m | 4.2m | galvanized | electrogalvanized | |
| Acrow 51.82 m Modular Bridge | 51.82m | 4.2m | galvanized | electrogalvanized | |
| Acrow 70‑ft 700XS Panel Bridge | 70 ft | 24 ft | galvanized | — | |
| Acrow 80‑ft Detour Bridge | — | — | galvanized to AASHTO M111‑ASTM A123 | electro galvanized | |
| Acrow 80‑ft Permanent Bridge | 80ft | 16.4ft | galvanized | electrogalvanized | |
| Acrow 90‑ft 700XS Panel Bridge | 90 ft | 24 ft | galvanized | — | |
| Acrow 100‑ft Permanent Bridge | 100ft | 16.4ft | galvanized | electrogalvanized | |
| Acrow 110‑ft Permanent Bridge | 110ft | 16.4ft | galvanized | electrogalvanized | |
| Acrow 120‑ft Modular Bridge | 120ft | 18ft | galvanized to AASHTO M111-ASTM A123 | electrogalvanized | |
| Acrow 120‑ft Modular Bridge (Utah) | 120ft | 30ft | galvanized | electrogalvanized | |
| Acrow 125‑ft Clear Span Rail Bridge | 125ft | 18ft,deck=rails on timber ties,erection=segmental lift,design_load=Cooper E80,finish=galvanized standard=AASHTO M111-AST | — | — | |
| Acrow 130‑ft Permanent Bridge | 130ft | 16.4ft | galvanized | electrogalvanized | |
| Acrow 160‑ft Temporary Bridge9 under it | — | — | galvanized | electrogalvanized | |
| Acrow 160‑ft Temporary Bridge (Ontario) | 160ft | 12ft | galvanized | electrogalvanized | |
| Acrow 170‑ft Temporary Lift Bridge | 170ft | 30ft | galvanized | electro‑galvanized | |
| Acrow 180‑ft Temporary Bridge (Port Bruce) | 54.8m | 5.48m | galvanized_AASHTO_M111_ASTMA123 | electro_galvanized | |
| Acrow 250‑ft Detour Bridge | 250ft,width=30ft,guideRails=TL-4,deckSurface=Epoxy aggregate,erectionMethod=Full cantilever launch,designLoad=HL-93,fini | — | — | — | |
| Acrow 260‑ft Bridge | 260',width=13.78',deck_surface=Epoxy aggregate,erection_method=Combined partial cantilever/crane-assisted launch,design_ | — | — | — | |
| Acrow 260‑ft Clear Span Bridge | 260ft | — | galvanized | ASTM A193 GD b7 | |
| Acrow 700XS Bridge – Alberta Hydro Plant | 180ft | 13.78ft | galvanized | electrogalvanized | |
| Acrow Bascule Bridge | — | 30ft | galvanized | — | |
| Acrow Detour Bridge 150‑ft (Anlaan) | 150ft | 18ft | galvanized | — | |
| Acrow Detour Bridge 150‑ft (C.A. Hull) | 150ft | 18ft | galvanized | — | |
| Acrow Detour Bridge 190‑ft (C.A. Hull) | 190ft | 18ft | galvanized | — | |
| Acrow Detour Bridge 230‑ft | 230ft | 30ft | galvanized | — | |
| Acrow temporary bridge | 140ft | 24ft | galvanized | electrogalvanized | |
| Acrow two-lane detour bridge20 under it | 133ft10in | 30ft | galvanized | electro galvanized | |
| Atlantic Host Bridge | — | 3.3m | — | — | |
| Bridge 1 (605 ft) | 605ft,width=24ft,guide rails=TL-4,deck surface=Epoxy aggregate,erection method=Crane lift-in,design load=HL-93,finish=ga | — | — | — | |
| Bridge 2 (620 ft) | 620ft,width=24ft,guide rails=TL-4,deck surface=Epoxy aggregate,erection method=Crane lift-in,design load=HL-93,finish=ga | — | — | — | |
| Bridge 3 (715 ft) | 715ft,width=24ft,guide rails=TL-4,deck surface=Epoxy aggregate,erection method=Crane lift-in,design load=HL-93,finish=ga | — | — | — | |
| Chile 1.47‑km Emergency Bridge | 1.47km | 7.35m | galvanized | — | |
| DSR2 Ile Verte temporary bridge | 250ft | 14ft | galvanized | electro galvanized | |
| DSR2H Ile Bigras temporary bridge | 350ft | 20ft | galvanized | electro galvanized | |
| East Lincoln Avenue Detour Bridge | 240ft | 24ft | galvanized | electrogalvanized | |
| Huasna 180‑ft Acrow Bridge | 180ft | 13.78ft | galvanized | electrogalvanized | |
| Paso Robles 170‑ft Acrow Bridge | 170ft | 13.78ft | galvanized | electrogalvanized | |
| Six‑span modular steel bridge | 980ft | 18ft | galvanized | electrogalvanized |
Documents
Where this comes from — 5 documents
A machine read this from documents Acrow Corporation of America publishes on its own website, as of October 12, 2026. FactoryRegistry has not verified it; the documents are the authority.
- Acrow’sModularSteelBridgeProvides: “Acrow’sModularSteelBridgeProvides”
- AcrowReconnectsKeyRouteAfterAbruptClosureofBridge, page 1: “modular steel structure”
- AcrowReconnectsKeyRouteAfterAbruptClosureofBridge: “AcrowReconnectsKeyRouteAfterAbruptClosureofBridge”
- AcrowSuppliesPermanentPedestrian: “AcrowSuppliesPermanentPedestrian”
- PrefabricatedModularSteelBridging: “PrefabricatedModularSteelBridging”
- TemporaryAcrowBridgeHelpsto: “TemporaryAcrowBridgeHelpsto”
