Model
Chile 1.47‑km Emergency Bridge
Made by Acrow Corporation of America
- Deck
- Epoxy aggregate
- Spans
- 37
- Width
- 7.35m
- Finish
- galvanized
- Length
- 1.47km
- Span length
- 39.62m
From Acrow Corporation of America’s own documents · read October 12, 2026 · not verified by FactoryRegistry
Documents
Where this comes from — 1 document
A machine read this from documents Acrow Corporation of America publishes on its own website, as of October 12, 2026. FactoryRegistry has not verified it; the documents are the authority.
- AcrowAidsReconstructionEffortsAfterMassive, page 1: “1.47‑kilometer‑long structure provided emergency access across the Río Biobío”
- AcrowAidsReconstructionEffortsAfterMassive: “AcrowAidsReconstructionEffortsAfterMassive”
