Model
Acrow 200‑ft Floating Bridge
Made by Acrow Corporation of America
- Span
- 100ft
- Finish
- galvanized
- Material
- steel
- Pin finish
- electrogalvanized
- Span count
- 2
- Bolt finish
- hot‑dip galvanized
- Design load
- HL-93
- Guide rails
- TL-2
- Deck surface
- Epoxy aggregate
- Roadway width
- 24ft
- Erection method
- Crane lift in (barge)
From Acrow Corporation of America’s own documents · read October 12, 2026 · not verified by FactoryRegistry
Documents
Where this comes from — 1 document
A machine read this from documents Acrow Corporation of America publishes on its own website, as of October 12, 2026. FactoryRegistry has not verified it; the documents are the authority.
- AcrowBridgeRestoresCriticalRouteforLouisianaResidents, page 1: “two 100' (30.48m) spans”
- AcrowBridgeRestoresCriticalRouteforLouisianaResidents: “AcrowBridgeRestoresCriticalRouteforLouisianaResidents”
