FactoryRegistry
Claim a page

Tobar Industries INC.

875 Jarvis Drive, #120, Morgan Hill, CA 95037

UNVERIFIEDLAST SEEN IN FEDERAL DATA — · 1 SOURCE

Present in a source dataset, with no recent operating signal.

DirectionsGo to companyClaim this pageGet the badge
Homepage of Tobar Industries INC.
Their homepage, crawled AUG 2026

What they make

Other Electronic Component Manufacturing334419

Tobar Industries builds custom products and parts using sheet metal fabrication, precision machining, electro-mechanical assembly, and turnkey assembly language. to us for contract manufacturing of items including: are enclosures, assemblies, frames, panels, medical equipment, workstations, benches, cabinets, shelving, and carts. The company provides paint finishes and serves the corporate, industrial, medical, and clean room applications.

SUMMARIZED FROM THE COMPANY’S OWN WEBSITE

Where it is

37.14213, -121.65204 · CENSUS TIGER
COUNTY
METRO AREA
ON GOOGLE MAPS

Other plants nearby

FacilityCityIndustryStatusDistance
MacomMorgan HillSemiconductor and Related Device Manufacturing
334413
UNVERIFIED0.3 KM
Wolfspeed INCMorgan HillSemiconductor and Related Device Manufacturing
334413
UNVERIFIED0.3 KM
Macom Technology Solutions INC.Morgan HillMetal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
332812
LIKELY ACTIVE0.3 KM
Morgan Hill SiteMorgan HillSemiconductor and Related Device Manufacturing
334413
LIKELY ACTIVE0.3 KM
Flextronics InternationalMorgan HillPrinted Circuit Assembly (Electronic Assembly) Manufacturing
334418
UNVERIFIED0.4 KM

Every listed plant in Santa Clara County

Also at this address

No other federal record shares this street address.

WHERE THIS RECORD COMES FROM — 1 FEDERAL SOURCE, 2 FIELDS

Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.

SourceEvidenceFirst seenLast seen
SBA LOANSEXISTENCEDEC 2017DEC 2017
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
FIELDSOURCESIGNAL
GEOMCENSUS GEOCODERAUG 2026
SBA LOANSBA LOANSDEC 2017

Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Report a correction · Request removal