Present in a source dataset, with no recent operating signal.
What they make
Semiconductor and Related Device Manufacturing334413The company makes fiber lasers, optics, and beam delivery systems. It produces lasers including industrial, high-power, ultra-compact, and ultrafast varieties, as well as laser processing heads and scanners. The company also offers components such as Bragg gratings and packaged the
SUMMARIZED FROM THE COMPANY’S OWN WEBSITE
Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Ise Labs INC | San Jose | Semiconductor and Related Device Manufacturing 334413 | UNVERIFIED | 0.0 KM |
| Celestica Corporation | San Jose | Printed Circuit Assembly (Electronic Assembly) Manufacturing 334418 | UNVERIFIED | 0.0 KM |
| Veritek Mfg Services | San Jose | Bare Printed Circuit Board Manufacturing 334412 | UNVERIFIED | 0.1 KM |
| Sierra Circuits INC | San Jose | Bare Printed Circuit Board Manufacturing 334412 | UNVERIFIED | 0.2 KM |
| Acronics Systems, INC. | San Jose | Printed Circuit Assembly (Electronic Assembly) Manufacturing 334418 | ACTIVE | 0.2 KM |
Also at this address
1 other record shares this street address. Separate filings can describe distinct businesses on one site, or the same plant recorded by different agencies, so every record is kept rather than merged away.
WHERE THIS RECORD COMES FROM — 1 FEDERAL SOURCE, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in RCRAINFO · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA FRS | EXISTENCE | AUG 2019 | AUG 2019 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | SEP 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.


