Operating signal within 12 months from two or more independent sources.
What they make
Bare Printed Circuit Board Manufacturing334412TTM Technologies manufactures PCBs, RF and specialty components, and micro,I/VRF systems. They utilize materials including ceramics and produce items such as transceivers, circulators, and multi-chip modules. The company serves the aerospace & defense, commercial space, automotive, data center"> TTM Technologies manufactures PCBs and RF components. They produce conventional, HDI, flex, rigid-flex, RF, and microwave PCBs,,I,
SUMMARIZED FROM THE COMPANY’S OWN WEBSITE
Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| TStream, Inc. | San Jose | Other Electronic Component Manufacturing 334419 | UNVERIFIED | 0.4 KM |
| Krypton Solutions LLC | San Jose | Bare Printed Circuit Board Manufacturing 334412 | UNVERIFIED | 0.4 KM |
| Dicar INC Dba Dicar Networks | San Jose | Other Electronic Component Manufacturing 334419 | UNVERIFIED | 1.7 KM |
| Pemstar | San Jose | Bare Printed Circuit Board Manufacturing 334412 | UNVERIFIED | 1.8 KM |
| Hastest Solutions, INC | San Jose | Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables 334513 | ACTIVE | 1.8 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 4 FEDERAL SOURCES, 9 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in CARB-TCH, EIS, TSCA · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| COMPANY SITE | OPERATING | JUL 2026 | AUG 2026 |
| SAM GOV | OPERATING | OCT 2025 | MAR 2026 |
| OSHA ITA | OPERATING | DEC 2025 | DEC 2025 |
| EPA FRS | EXISTENCE | AUG 2022 | AUG 2024 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| ADDRESS LINE1 | SAM GOV | OCT 2025 |
| CAGE CODE | SAM GOV | OCT 2025 |
| CITY | EPA FRS | JUL 2026 |
| CITY | SAM GOV | OCT 2025 |
| EMPLOYEE BAND | OSHA ITA | DEC 2025 |
| GEOM | CENSUS GEOCODER | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| NAME | SAM GOV | OCT 2025 |
| REGISTRATION EXPIRATION | SAM GOV | OCT 2025 |
| STATE | EPA FRS | JUL 2026 |
| STATE | SAM GOV | OCT 2025 |
| WEBSITE | SAM GOV | OCT 2025 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.


