Present in a source dataset, with no recent operating signal.
What they make
Cut Stock, Resawing Lumber, and Planing321912Green Frog Systems0 as well as energy storage and solar lighting. The company manufactures cleaning compounds, lubricants, fuel, and corrosion remover. It serves the industries of mining, logistics, trucking, equipment rentals, and cleaning/san: are used for applications including street lighting, pathways to the maintenance of equipment, facilities, grounds, and fleets.
SUMMARIZED FROM THE COMPANY’S OWN WEBSITE
Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Wa317943565 - Reichert Shake & Fencing INC | Toledo | All Other Miscellaneous Wood Product Manufacturing 321999 | UNVERIFIED | 14.6 KM |
| Northwest Containers INC | Toledo | Wood Container and Pallet Manufacturing 321920 | UNVERIFIED | 18.1 KM |
| Sevilla Construction LLC | Chehalis | Manufactured Home (Mobile Home) Manufacturing 321991 | ACTIVE | 26.8 KM |
| Swanson Bark and Wood Products | Longview | All Other Miscellaneous Wood Product Manufacturing 321999 | UNVERIFIED | 31.4 KM |
| Cedar Ridge Industries LLC | Chehalis | Prefabricated Wood Building Manufacturing 321992 | UNVERIFIED | 35.5 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in RCRAINFO, SFDW, WA-FSIS · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA FRS | EXISTENCE | APR 2019 | APR 2019 |
| EPA ECHO | OPERATING | MAY 1996 | MAY 1996 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | SEP 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.


